Your browser doesn't support javascript.
Show: 20 | 50 | 100
Results 1 - 1 de 1
Filter
Add filters

Database
Language
Document Type
Year range
1.
SME Annual Conference and Expo 2023 ; 2023.
Article in English | Scopus | ID: covidwho-20242191

ABSTRACT

Over it's more than 100-year history, the Kennecott operation has often been at the forefront of innovation;driven by the demands of the lower grade ore-body and the higher costs of operating in the US where wages are generally higher and regulation more restrictive. One way of reducing operating costs in c/lb is to increase the lbs produced at minimal cost. Despite the relatively coarse grind at Kennecott - about 30% >150μm, approximately 20% of the Cu lost to tail is liberated chalcopyrite in the <20μm fraction, and about 30%-40% in the <37μm fraction. In 2020 Kennecott undertook a detailed plant scale test of the magnetic aggregation technology to increase copper recovery by reducing fine copper losses. A paired statistical plant test of magnetic conditioning on one rougher line showed a 1.12% increase in Cu recovery to 97% statistical confidence. The next challenge, unforeseen at the start of the project, was the fabrication and transportation to site of the equipment for the three remaining rougher rows, during the severe supply-chain constraints of the Covid pandemic in 2021. This resulted in delays and unforeseen costs as world-wide transportation became chaotic, particularly transportation via west coast USA. Nevertheless, the project was completed and commissioned, with only minor delays and cost increases, due to a flexible approach to overcoming the hurdles encountered. Copyright © 2023 by SME.

SELECTION OF CITATIONS
SEARCH DETAIL